AFTER:
The transformation is remarkable. The fully refurbished pool now features:
✅ Pristine resurfacing with anti-slip finish
✅ Replacement of existing ceramic tiles and coping stones
✅ Installation of new stainless steel access ladders, grab rail, and leaf skimmer baskets
✅ Full repainting
✅ Bright, clear water with reinstated lane markings
✅ Modern tiling and coping edge installation
✅ Fresh artificial turf surrounds, offering safety and aesthetic appeal
✅ Enlarged plant room wall openings with stainless steel grating for ventilation/security
✅ Updated health & safety signage with new wall-mounted units
✅Replacement of all existing pipework and fittings, including new depth markers
✅ Installation of 2x new hot water cylinders.
BEFORE: Mangere College Pool - wider view of the deteriorated pool area, capturing the extensive staining, missing tiles, and further evidence of structural neglect. The facility was clearly in need of a full overhaul to bring it back to standard.
BEFORE:
The Māngere College pool was in a state of disrepair. Years of wear and exposure had left the pool empty, contaminated, and structurally neglected. The original surface showed signs of algae buildup, structural staining, cracked lining, and debris. The surrounding area was aged, with no safe or visually appealing surrounds for poolside access.
Issues identified:
Significant surface degradation and biological growth.
Debris and broken elements throughout the base.
Faded or missing lane markings.
Old or nonexistent coping and edge safety.
Final photo - Mangere College pool - This revitalised aquatic space is now a functional, safe, and vibrant facility ready for student recreation, physical education, and school sports events. The transformation not only enhances the visual appeal but also ensures longevity and safety for future generations of students.