top of page
APS red backg.jpg
APS_waterproofing_white.png

Check out the Height Safety Services we offer

Works by Abseil

Chatham Apartments

Our team completed a comprehensive exterior repaint of Chatham Apartments, beginning with a full building wash to remove contaminants and prepare surfaces for coating. Works included minor repairs, surface preparation, and application of a premium exterior paint system to walls, balconies, soffits, columns, and architectural features, enhancing both appearance and long-term durability.

ACG Sunderland Block A

To address ongoing water ingress issues at ACG Sunderland Block A, our team upgraded the ageing roof glazing system by installing powder-coated aluminium cover caps over the existing framing. the part that was subcontracted was the removal of the redundant louvre system and installed new double-glazed units with clear laminated safety glass and grey Stopsol reflective glass, improving weatherproofing while maintaining natural light transmission within the auditorium and classroom areas.

Music School

The removal of established wisteria at the University of Auckland’s Music School helped protect surrounding building surfaces, improve drainage performance, and enhance access for ongoing maintenance. Clearing the overgrowth reduces the risk of future damage and supports the long-term upkeep and presentation of the facility.

Hudson Brown

Hudson Brown – Bird Spike Renewal

Bird deterrent systems were upgraded at Hudson Brown through the renewal and replacement of damaged, rusted, and missing bird spikes. The works included removing deteriorated sections, reinstating protection in affected areas, and closing gaps within the existing system to improve effectiveness and help prevent pest bird activity.

University of Waikato

Our specialist rope access team completed exterior building wash and maintenance works at the University of Waikato, using abseiling techniques to safely access and clean difficult-to-reach areas. The project removed environmental build-up, enhanced the building's appearance, and supported the University's ongoing asset maintenance programme with minimal disruption to campus operations.

University of Auckland

Our heights team completed a building wash project at Building 405, University of Auckland, as part of the University's ongoing school programme maintenance and cleaning schedule. Using specialist access methods, the team safely restored the building's exterior appearance, removing dirt and environmental build-up while helping to preserve the facility's condition and presentation.

Pullman Rotorua

Our specialist abseiling team successfully completed the window seal replacement project at Pullman Rotorua. Using rope-access techniques, the team safely accessed challenging elevations to remove and replace deteriorated seals, improving weatherproofing, building performance, and aesthetics while minimising disruption to hotel operations.

Novotel Airport

Maintained a safe exclusion zone to protect personnel and site operations during inspection activities. Provided an Elevated Work Platform (EWP) and access support for engineers conducting detailed inspections of steel beam corrosion, enabling safe assessment, defect identification, and condition reporting for future maintenance planning.

Westwater Ponsonby

Completed specialised window rubber replacement works at Westwater using rope access techniques. By accessing the building façade via abseil, our technicians safely replaced deteriorated window seals, improving weather-tightness and building performance. The project was completed efficiently with minimal disruption, demonstrating APS's expertise in safe, cost-effective high-rise maintenance solutions.

Rainbows End

Our team delivered specialist cleaning and maintenance services at Rainbow’s End, working safely within a high-risk environment to help keep key attractions and ride structures in excellent condition. The project focused on preserving presentation, safety, and operational standards, ensuring these iconic assets remain well-maintained and ready to provide an outstanding visitor experience.

Microsoft Building

The Microsoft Building refresh involved a complete exterior wash and repaint of the concrete façade, restoring its appearance and extending its service life. Delivered by our specialist Abseiling Team and Heights Division, the project combined meticulous surface preparation, precision painting, and safe, efficient access solutions to achieve a durable, high-quality finish.

bottom of page